Ascenty Sumaré 4

ColocationBuildingUnder construction

Ascenty Sumaré 4 is listed as "Sumaré 4" on the Ascenty website, with a status of under construction. The facility publishes 19 MW of utility power and 96,875 sq ft (9,000 m²) of floor area. Among listed buildings in Sumaré that publish a utility power figure, it ranks second of five, tied with two others, behind Ascenty Sumaré 2, the largest in that group; among listed buildings in Brazil publishing the same figure it ranks 11th of 51, tied with five others, with Ascenty Vinhedo 2 the largest nationally. By floor area, it ranks fifth of five in Sumaré and 23rd of 65 in Brazil, tied with one other, with Aligned ODATA DC SP02 Data Center the largest nationally. Ascenty operates six listings in Sumaré, ranking first among operators there, and 34 in Brazil overall, with other Ascenty sites located in Hortolândia, São Paulo, Fortaleza and Jundiaí. Nearby Ascenty facilities include Sumaré 1, 2, 3 and 5, DC Ascenty Sumaré, and Ascenty DC Hortolândia.

Written by a language model (Claude) from this record's data, and checked automatically against it: every figure, name, status and rank in it comes from the record.

Operator
Ascenty
Status
Under construction
Address
Rod. Anhanguera, s/n Sumaré – SP – Parque das Industrias (Nova Veneza), Sumaré – SP, 13177-435
City
Sumaré
Region
São Paulo Interior
Country
Brazil
Coordinates
-22.31413, -49.06299
Location accuracy
Approximate (area center)
Facility type
Colocation
Record level
Building
Published capacity
19 MW of utility power; 96,875 sq ft (9,000 m²) of floor area
Website
ascenty.com/data-centers/localizacao/brasil/sao-paulo-interior/sumare/

Approximate location.

Other Ascenty facilities

Ascenty: all 42 listed facilities

Sources for this record

Sources for this record
SourceListed asLinkRetrieved
Ascenty websiteSumaré 4Operator page2026-09-28

Source data retrieved 2026-09-28. How the data is compiled

Report an error in this listing