Ascenty Sumaré 3

ColocationBuildingUnder construction

Ascenty Sumaré 3 is listed as under construction, with published figures of 19 MW of utility power and 118,403 sq ft (11,000 m²) of floor area. Among listed buildings in Sumaré that publish a utility power figure, it ranks second of five, tied with two others, behind Ascenty Sumaré 2, and the same ranking of second of five, tied with two others, applies for floor area. Nationally, among listed buildings in Brazil that publish utility power, it ranks 11th of 51, tied with five, behind Ascenty Vinhedo 2, and for floor area it ranks 15th of 65, tied with two, behind Aligned ODATA DC SP02 Data Center. Ascenty operates six listed facilities in Sumaré, ranking first among operators there, and holds 34 listings across Brazil in total, including sites in Hortolândia, São Paulo, Fortaleza and Jundiaí. Nearby operator sites include Ascenty Sumaré 1, Sumaré 2, Sumaré 4, Sumaré 5, DC Ascenty Sumaré and Ascenty DC Hortolândia. The facility is listed as Sumaré 3 on the Ascenty website.

Written by a language model (Claude) from this record's data, and checked automatically against it: every figure, name, status and rank in it comes from the record.

Operator
Ascenty
Status
Under construction
Address
Rod. Anhanguera, s/n Sumaré – SP – Parque das Industrias (Nova Veneza), Sumaré – SP, 13177-435
City
Sumaré
Region
São Paulo Interior
Country
Brazil
Coordinates
-22.31413, -49.06299
Location accuracy
Approximate (area center)
Facility type
Colocation
Record level
Building
Published capacity
19 MW of utility power; 118,403 sq ft (11,000 m²) of floor area
Website
ascenty.com/data-centers/localizacao/brasil/sao-paulo-interior/sumare/

Approximate location.

Other Ascenty facilities

Ascenty: all 42 listed facilities

Sources for this record

Sources for this record
SourceListed asLinkRetrieved
Ascenty websiteSumaré 3Operator page2026-09-28

Source data retrieved 2026-09-28. How the data is compiled

Report an error in this listing