Data centers in the Mumbai market
The Mumbai market, as defined here, takes in every listed facility within 50 km of Mumbai: 68 data centers in 4 towns and cities, led by Mumbai (51), Navi Mumbai (14), Thane (2) and Rasayani (1). That is 18% of the listings in India, the largest of 5 markets there.
The operators with the most listings are STT GDC (10), NTT Global Data Centers (7) and CtrlS (6), out of 23 named operators.
The three operators with the most listings hold 34% of them; 10 of the 23 named operators have a single listed facility here. Published power figures for single buildings add up to 458 MW of IT load across 17 buildings; buildings that publish no figure are not counted. 12 facilities hold an Uptime Institute Tier certification (9 Tier III and 3 Tier IV). Tier IV: Mumbai Data Center, Vodafone Data Center-A and Yotta NM1. Listings not yet in operation: 6 planned and 3 under construction. Among them: STT GDC STT Palava 4, STT GDC STT Palava 5, STT GDC STT Palava 1 and STT GDC STT Navi Mumbai 2.
About the Mumbai market
The directory lists 68 data centers in the Mumbai market, 20th of the 64 markets it covers and 18 percent of the 374 listed in India. Mumbai itself holds 51, or 75 percent of the market, and Navi Mumbai 14; Thane has 2 and Rasayani 1.
23 operators are named. STT GDC has the most listings, 10, followed by NTT Global Data Centers with 7, CtrlS with 6, Nxtra with 5 and Equinix with 4. Colocation sites make up 50 of the records, with 9 enterprise sites and 2 cloud regions.
Capacity is published as IT load, by 17 buildings. The largest are STT GDC's Palava 4 and Palava 5 at 60.5 MW each, both still planned, followed by Yotta NM1 in Navi Mumbai at 52 MW. By floor area, AirTrunk's BOM3 is the largest listed building at about 969,000 square feet, ahead of Yotta NM1 at 820,000 and NTT's Navi Mumbai Data Center at about 398,000.
STT GDC accounts for all 6 planned facilities, including Navi Mumbai 2, Navi Mumbai 3 and Palava 1. 3 more are under construction: CtrlS Mumbai DC6 and DC7, and EdgeConneX's Mumbai and Navi Mumbai sites. 12 facilities hold an Uptime Institute certification, 3 of them at Tier IV, including Yotta NM1 and Vodafone Data Center-A.
Towns and cities
Mumbai (51) · Navi Mumbai (14) · Thane (2) · Rasayani (1)
Facilities
Operators
| Operator | Facilities |
|---|---|
| STT GDC | 10 |
| NTT Global Data Centers | 7 |
| CtrlS | 6 |
| Nxtra | 5 |
| Equinix | 4 |
| AirTrunk | 3 |
| Sify | 3 |
| Yotta | 3 |
| Colt DCS | 2 |
| EdgeConneX | 2 |
| Iron Mountain | 2 |
| Mahanagar Telephone Nigam Limited, Mumbai | 2 |
| Web Werks India Pvt. Ltd. | 2 |
| Amazon Web Services | 1 |
| BSNL - Dimension Data | 1 |
| ESDS | 1 |
| GPX Global Systems | 1 |
| Globalcom IDC Limited | 1 |
| Larsen & Toubro Limited | 1 |
| Oracle | 1 |
| Princeton Digital Group | 1 |
| Vodafone | 1 |
| Vodafone Shared Service Limited | 1 |
Largest data centers in the Mumbai market by power
| Facility | Operator | MW of IT load |
|---|---|---|
| STT GDC STT Palava 4 | STT GDC | 60.5 |
| STT GDC STT Palava 5 | STT GDC | 60.5 |
| Yotta NM1 | Yotta | 52 |
| STT GDC STT Palava 1 | STT GDC | 50 |
| STT GDC STT Navi Mumbai 2 | STT GDC | 49 |
| STT GDC STT Navi Mumbai 3 | STT GDC | 42 |
| STT GDC STT Navi Mumbai 4 | STT GDC | 36 |
| NTT Global Data Centers Navi Mumbai Data Center | NTT Global Data Centers | 30.4 |
| STT GDC STT Navi Mumbai 1 | STT GDC | 28 |
| NTT Global Data Centers Mumbai 7 Data Center | NTT Global Data Centers | 25.6 |
Top 10 of 17 buildings that publish their IT load in MW. Figures of other kinds (campus totals, or power without a stated measure) are not ranked with them.
Planned and new data centers in the Mumbai market
| Facility | Operator | Status | Planned opening |
|---|---|---|---|
| CtrlS Mumbai DC6, DC7 | CtrlS | Under construction | not recorded |
| EdgeConneX Mumbai, India | EdgeConneX | Under construction | not recorded |
| EdgeConneX Navi Mumbai, India | EdgeConneX | Under construction | not recorded |
| STT GDC STT Navi Mumbai 2 | STT GDC | Planned | not recorded |
| STT GDC STT Navi Mumbai 3 | STT GDC | Planned | not recorded |
| STT GDC STT Navi Mumbai 4 | STT GDC | Planned | not recorded |
| STT GDC STT Palava 1 | STT GDC | Planned | not recorded |
| STT GDC STT Palava 4 | STT GDC | Planned | not recorded |
| STT GDC STT Palava 5 | STT GDC | Planned | not recorded |
Largest facilities by floor area
| Facility | Operator | Floor area, sq ft |
|---|---|---|
| AirTrunk BOM3 Mumbai | AirTrunk | 968,751 |
| Yotta NM1 | Yotta | 820,000 |
| NTT Global Data Centers Navi Mumbai Data Center | NTT Global Data Centers | 398,264 |
| AirTrunk BOM1 Mumbai | AirTrunk | 371,355 |
| CtrlS Mumbai DC4 | CtrlS | 265,000 |
| AirTrunk BOM2 Mumbai | AirTrunk | 244,341 |
| CtrlS Mumbai DC5 | CtrlS | 228,482 |
| Equinix Mumbai MB3 | Equinix | 155,538 |
| CtrlS Mumbai DC3 | CtrlS | 146,000 |
| NTT Global Data Centers Mumbai 7 Data Center | NTT Global Data Centers | 110,868 |
| NTT Global Data Centers Mumbai 6 Data Center | NTT Global Data Centers | 90,417 |
| NTT Global Data Centers Mumbai 5 Data Center | NTT Global Data Centers | 72,118 |
| Equinix Mumbai MB2 | Equinix | 32,529 |
| NTT Global Data Centers Mumbai Vikhroli Data Center | NTT Global Data Centers | 32,292 |
| Equinix Mumbai MB1 | Equinix | 18,352 |