Vantage Fredericksburg (VA4) Data Center Campus
Vantage Fredericksburg (VA4) Data Center Campus, at 225 Centreport Parkway, Fredericksburg, Virginia 22406, USA, is listed with a whole-campus capacity of 192 MW and 929,000 sq ft (86,307 m²) of floor area. The facility is the only listing Vantage has in Fredericksburg, out of 41 listings the operator holds across the United States and 92 in total. Vantage's other cities in the country include Sterling with 7 listings, San Antonio with 5, Quincy with 4, and New Albany with 3, among 12 other cities in all. The operator's nearest other sites to this campus include Vantage Ashburn II (VA2) Data Center Campus, Vantage VA16, Vantage Ashburn I (VA1) Data Center Campus, Vantage VA12, Vantage VA11, and Vantage VA14. The facility is recorded at the campus level, and its status is not recorded. It is listed on the Vantage website as Fredericksburg (VA4) Data Center Campus.
Written by a language model (Claude) from this record's data, and checked automatically against it: every figure, name, status and rank in it comes from the record.
- Operator
- Vantage
- Facility code
- VA4
- Address
- 225 Centreport Parkway, Fredericksburg, Virginia 22406, USA
- City
- Fredericksburg
- State
- Virginia
- Country
- United States
- Coordinates
- 38.30987, -77.46632
- Location accuracy
- Published location
- Facility type
- Colocation
- Record level
- Campus
- Published capacity
- 192 MW for the whole campus; 929,000 sq ft (86,307 m²) of floor area
- Website
- vantage-dc.com/data-center-locations/north-america/fredericksburg-va
Other Vantage facilities
- Vantage Ashburn II (VA2) Data Center CampusSterling, United States
- Vantage VA16Sterling, United States
- Vantage Ashburn I (VA1) Data Center CampusSterling, United States
- Vantage VA12Sterling, United States
- Vantage VA11Sterling, United States
- Vantage VA14Sterling, United States
Vantage: all 92 listed facilities
Sources for this record
| Source | Listed as | Link | Retrieved |
|---|---|---|---|
| Vantage website | Fredericksburg (VA4) Data Center Campus | Operator page | 2026-09-28 |
Source data retrieved 2026-09-28. How the data is compiled