Uptime Institute lists this facility under three different names: P2 Perth, Day 1, Data Hall 1 (Level 3); P2 Perth, Stage 1, Phase 1; and P2 Perth, Stages 1 and 3. The site holds Tier IV certification from Uptime Institute, covering Certification of Constructed Facility, Certification of Constructed Facility - Provisional, Certification of Design Documents, and Gold Certification of Operational Sustainability, one of 39 Uptime-certified facilities recorded in Australia. The facility is operated by NEXTDC, which ranks second among 5 operators in Perth, with 10 listings in the city in total, 2 of them belonging to NEXTDC. Across Australia, NEXTDC has 32 listings in total out of 35 overall, spread across 20 other cities in the country including Artarmon and Macquarie Park with 3 listings each, and Adelaide and Brisbane with 2 each. NEXTDC's nearest other listed sites include NEXTDC P2 Perth Data Centre and NEXTDC P1 Perth Data Centre. The location is recorded as approximate, placing it at the city center, and no status is recorded for the facility.
Written by a language model (Claude) from this record's data, and checked automatically against it: every figure, name, status and rank in it comes from the record.
- Operator
- NEXTDC
- City
- Perth
- Country
- Australia
- Coordinates
- -31.95590, 115.86058
- Location accuracy
- Approximate (city center)
- Facility type
- Colocation
- Record level
- Building
- Uptime Institute certification
- Tier IV (Certification of Constructed Facility; Certification of Constructed Facility - Provisional; Certification of Design Documents; Gold Certification of Operational Sustainability)
Approximate location.
Other NEXTDC facilities
- NEXTDC P2 Perth Data CentrePerth, Australia
- NEXTDC P1 Perth Data CentreMalaga, Australia
- NEXTDC PH1 Port Hedland Data CentrePort Hedland, Australia
- NEXTDC NE1 Newman Data CentrePilbara, Australia
- NextDC A1Adelaide, Australia
- NEXTDC D2 Darwin Data CentreDarwin, Australia
NEXTDC: all 35 listed facilities
Sources for this record
| Source | Listed as | Link | Retrieved |
|---|---|---|---|
| Uptime Institute | P2 Perth, Day 1, Data Hall 1 (Level 3) | Uptime Institute list | 2026-09-26 |
| Uptime Institute | P2 Perth, Stage 1, Phase 1 | Uptime Institute list | 2026-09-26 |
| Uptime Institute | P2 Perth, Stages 1 and 3 | Uptime Institute list | 2026-09-26 |
Source data retrieved 2026-09-26. How the data is compiled