Data Centers Intel

NEXTDC P1 Perth Data Centre

ColocationBuilding

NEXTDC P1 Perth Data Centre, at 4 Millrose Drive, Malaga, WA, 6090, publishes an IT load of 10 MW and a floor area of 32,292 sq ft (3,000 m²). Among listed buildings in Australia that publish an IT load figure, it ranks ninth of sixteen, with NEXTDC M3 Melbourne Data Centre listed as the largest; by floor area it ranks 24th of 39, with AirTrunk SYD3 Sydney West listed as the largest. The facility holds Uptime Institute Tier III status, covering Certification of Constructed Facility, Certification of Design Documents, and Gold Certification of Operational Sustainability. It is listed on the NEXTDC website as P1 Perth Data Centre and by Uptime Institute as P1 Data Centre and P1 Data Centre, Phase 1A. NEXTDC operates 35 listed facilities in total, 32 of them in Australia, with this the only one recorded in Malaga; the operator's other Australian cities include Artarmon, Macquarie Park, Adelaide, and Brisbane. Nearby operator sites include NEXTDC P2 Perth Data Centre.

Written by a language model (Claude) from this record's data, and checked automatically against it: every figure, name, status and rank in it comes from the record.

Operator
NEXTDC
Facility code
P1
Address
4 Millrose Drive, Malaga, WA, 6090
City
Malaga
Region
WA
Country
Australia
Coordinates
-31.86622, 115.89788
Location accuracy
Geocoded from the street address
Facility type
Colocation
Record level
Building
Published capacity
10 MW of IT load; 32,292 sq ft (3,000 m²) of floor area
Uptime Institute certification
Tier III (Certification of Constructed Facility; Certification of Design Documents; Gold Certification of Operational Sustainability)
Website
nextdc.com/data-centres/perth-data-centres/p1-perth

Other NEXTDC facilities

NEXTDC: all 35 listed facilities

Sources for this record

Sources for this record
SourceListed asLinkRetrieved
NEXTDC websiteP1 Perth Data CentreOperator page2026-09-28
Uptime InstituteP1 Data CentreUptime Institute list2026-09-26
Uptime InstituteP1 Data Centre, Phase 1AUptime Institute list2026-09-26

Source data retrieved 2026-09-28. How the data is compiled

Report an error in this listing