Data Centers Intel

NCAR-Wyoming Supercomputing Center

EnterpriseBuilding

NCAR-Wyoming Supercomputing Center holds the largest mapped building outline among the three mapped outlines in Cheyenne, with a footprint of 9,404 square meters across two floors. Located at 8120 Veta Drive in Cheyenne, Wyoming, the facility is operated by University Corporation for Atmospheric Research, which has one listing in the city, one in the country, and one in total in this directory, ranking second among three operators in Cheyenne, tied with one other operator. The facility opened in 2003; among listed facilities in the United States with a recorded opening year, 55 report one, and 14 of those opened earlier. Within 5 km there are two other listed facilities, both operated by Microsoft: CYS41 Datacenter at 0.48 km and CYS42 Datacenter at 1.03 km. The facility appears in OpenStreetMap and Wikidata, both listing it as NCAR-Wyoming Supercomputing Center. No status is recorded for the facility.

Written by a language model (Claude) from this record's data, and checked automatically against it: every figure, name, status and rank in it comes from the record.

Operator
University Corporation for Atmospheric Research
Address
8120 Veta Drive
City
Cheyenne
State
Wyoming
Country
United States
Coordinates
41.12875, -104.89743
Location accuracy
Published location
Facility type
Enterprise
Record level
Building
Building footprint
9,404 m² (mapped outline in OpenStreetMap)
Floors
2
Opened
2003
Website
nwsc.ucar.edu/visitor-center

Facilities within 5 km

Facilities within 5 km
FacilityOperatorDistance
CYS41 DatacenterMicrosoft0.48 km
CYS42 DatacenterMicrosoft1.03 km

Other data centers in Wyoming

Sources for this record

Sources for this record
SourceListed asLinkRetrieved
OpenStreetMapNCAR-Wyoming Supercomputing CenterOpenStreetMap record2026-09-26
WikidataNCAR-Wyoming Supercomputing CenterWikidata item2026-09-26

Source data retrieved 2026-09-26. How the data is compiled

Report an error in this listing