FABMISR Green Edge Data Center
Uptime Institute lists the FABMISR Green Edge Data Center under that same name, and the facility holds a Tier III Certification of Design Documents from Uptime Institute. First Abu Dhabi Bank Misr operates the site as its only listed facility in Cairo and in Egypt as a whole, placing the operator fifth by listing count among 14 operators in Cairo, tied with nine others, and fifth among 19 operators across the Cairo market of 27 listings, tied with fourteen others there. Cairo itself carries 20 listings in this directory. Location accuracy for the record is approximate, given at city center level rather than a precise address. Egypt's list of Uptime-certified facilities totals 29 entries, of which this facility is one. No operational status has been recorded for the facility in this record, and the record does not include an opening year, floor area, IT load, or utility power figure.
Written by a language model (Claude) from this record's data, and checked automatically against it: every figure, name, status and rank in it comes from the record.
Approximate location.
Other data centers in Cairo
- AAIB One-Ninety Headquarter Main Data Center, Room LG038Cairo, Egypt
- ADCB Egypt Main Data CenterCairo, Egypt
- CBE DT Data CenterCairo, Egypt
- City Operation Center (COC) Project Building, Capital Data Center (CDC), Phase 1Cairo, Egypt
- EBC HQ Data CenterCairo, Egypt
- El Shorouk 2 Data CenterCairo, Egypt
Sources for this record
| Source | Listed as | Link | Retrieved |
|---|---|---|---|
| Uptime Institute | FABMISR Green Edge Data Center | Uptime Institute list | 2026-09-26 |
Source data retrieved 2026-09-26. How the data is compiled