Ahmedabad Datacenter Phase I
Ahmedabad Datacenter Phase I is listed by Uptime Institute under that same name, holding Uptime Institute certification of Tier III (Certification of Constructed Facility; Certification of Design Documents), one of 49 facilities in India carrying Uptime certification. The facility is operated by BSNL - Dimension Data, which ranks first among four operators in Ahmedabad by number of listings, tied with three others, with one listing in the city out of five total listings there. Across India, BSNL - Dimension Data holds six listings in total, all within the country, spread across five other cities including Faridabad, Ghaziabad, Jaipur and Ludhiana, each with one listing. The operator's nearest other sites include Mumbai Datacenter Phase I, Jaipur Datacenter Phase I, Faridabad Datacenter Phase I, Ghaziabad Datacenter Phase I and Ludhiana Datacenter Phase I. The record identifies this entry at the building level, with location given only as an approximate city-centre position, and no status is recorded for the facility.
Written by a language model (Claude) from this record's data, and checked automatically against it: every figure, name, status and rank in it comes from the record.
- Operator
- BSNL - Dimension Data
- City
- Ahmedabad
- Country
- India
- Coordinates
- 23.02154, 72.58006
- Location accuracy
- Approximate (city center)
- Facility type
- Enterprise
- Record level
- Building
- Uptime Institute certification
- Tier III (Certification of Constructed Facility; Certification of Design Documents)
Approximate location.
Other BSNL - Dimension Data facilities
- Mumbai Datacenter Phase IMumbai, India
- Jaipur Datacenter Phase IJaipur, India
- Faridabad Datacenter Phase IFaridabad, India
- Ghaziabad Datacenter Phase IGhaziabad, India
- Ludhiana Datacenter Phase ILudhiana, India
BSNL - Dimension Data: all 6 listed facilities
Sources for this record
| Source | Listed as | Link | Retrieved |
|---|---|---|---|
| Uptime Institute | Ahmedabad Datacenter Phase I | Uptime Institute list | 2026-09-26 |
Source data retrieved 2026-09-26. How the data is compiled