Data centers in Sterling
92 data centers are listed in Sterling, Virginia. Operators present include Amazon Web Services (47), Centersquare (9), Vantage (7) and CyrusOne (6), plus 9 others. By type, the listings in Sterling, Virginia are 53% hyperscaler-owned, 40% colocation and 7% unclassified. Across Virginia the hyperscaler-owned share is 38%.
By published IT load, the largest single buildings are CyrusOne Sterling, VA, NVA9 (CyrusOne, 38 MW) and CyrusOne Sterling, VA, NVA8 (CyrusOne, 24 MW). Nearby cities with listed data centers: Dulles (3 km, 4), Ashburn (4 km, 106) and Herndon (6 km, 13).
By number of listings it ranks 2nd of 19 cities with a page in Virginia, with 23% of all listings in Virginia. The three operators with the most listings hold 68% of them; 4 of the 13 named operators have a single listed facility here. Published power figures for single buildings add up to 77 MW of IT load across 4 buildings and 96 MW of utility power across 1 building; buildings that publish no figure are not counted. Listings not yet in operation: 3 under construction. Among them: PowerHouse Pacific Building 1, PowerHouse Pacific Building 2 and PowerHouse Pacific Building 3.
Sterling is part of the Northern Virginia market, which has 350 listed data centers across the metro area.
Facilities
Operators
| Operator | Facilities |
|---|---|
| Amazon Web Services | 47 |
| Centersquare | 9 |
| Vantage | 7 |
| CyrusOne | 6 |
| Digital Realty | 5 |
| QTS | 5 |
| STACK Infrastructure | 3 |
| EdgeCore | 2 |
| 2 | |
| Aligned | 1 |
| GI Partners | 1 |
| Lumen | 1 |
| PowerHouse | 1 |
Largest facilities by floor area
| Facility | Operator | Floor area, sq ft |
|---|---|---|
| CyrusOne Sterling, VA, NVA9 | CyrusOne | 700,000 |
| Digital Realty IAD44 | Digital Realty | 648,500 |
| CyrusOne Sterling, VA, NVA8 | CyrusOne | 154,230 |
| CyrusOne Sterling, VA, NVA4 | CyrusOne | 128,715 |
Largest data centers in Sterling, Virginia by power
| Facility | Operator | MW of IT load |
|---|---|---|
| CyrusOne Sterling, VA, NVA9 | CyrusOne | 38 |
| CyrusOne Sterling, VA, NVA8 | CyrusOne | 24 |
| CyrusOne Sterling, VA, NVA4 | CyrusOne | 11 |
| QTS Ashburn Moran | QTS | 4 |
Top 10 of 4 buildings that publish their IT load in MW. Figures of other kinds (campus totals, or power without a stated measure) are not ranked with them.
Planned and new data centers in Sterling, Virginia
| Facility | Operator | Status | Planned opening |
|---|---|---|---|
| PowerHouse Pacific Building 1 | PowerHouse | Under construction | not recorded |
| PowerHouse Pacific Building 2 | not recorded | Under construction | not recorded |
| PowerHouse Pacific Building 3 | not recorded | Under construction | not recorded |