YYZ2-A Phase I (Formerly TR3)
YYZ2-A Phase I (Formerly TR3) appears across three separate Uptime Institute listings, cited as "YYZ2-A Phase I (Formerly TR3)", "YYZ2-A Phase I (Formerly TR3), Phase I", and "YYZ2-A Phase I (Formerly TR3), Phase I & II". The facility holds Tier III certification from Uptime Institute, covering Certification of Constructed Facility, Certification of Design Documents, M&O Stamp of Approval, and Silver Certification of Operational Sustainability. Centersquare, the operator, ranks first among five operators in Markham, tied with two others, on a count of eleven listings in the city, and ranks third among nineteen operators in the Toronto market, tied with one other, with four listings there. In Canada, Centersquare holds six listings in total, with other locations in Mississauga, Montreal, and Vancouver. Nearby operator sites include Centersquare Markham YYZ2 Data Center and YYZ1-A (Formerly TR1). The record does not give a status for this facility, and location accuracy is listed as approximate, based on the city center.
Written by a language model (Claude) from this record's data, and checked automatically against it: every figure, name, status and rank in it comes from the record.
- Operator
- Centersquare
- City
- Markham
- Market
- Toronto
- Country
- Canada
- Coordinates
- 43.85637, -79.33768
- Location accuracy
- Approximate (city center)
- Facility type
- Colocation
- Record level
- Building
- Uptime Institute certification
- Tier III (Certification of Constructed Facility; Certification of Design Documents; M&O Stamp of Approval; Silver Certification of Operational Sustainability)
Approximate location.
Other Centersquare facilities
- Centersquare Markham YYZ2 Data CenterMarkham, Canada
- YYZ1-A (Formerly TR1)Mississauga, Canada
- Centersquare Mississauga YYZ1 Data CenterMississauga, Canada
- YVR-1Vancouver, Canada
- Centersquare Lewis Center CMH1 Data CenterLewis Center, United States
- Centersquare Columbus Data Center (Lewis)Lewis Center, United States
Centersquare: all 113 listed facilities
Sources for this record
| Source | Listed as | Link | Retrieved |
|---|---|---|---|
| Uptime Institute | YYZ2-A Phase I (Formerly TR3) | Uptime Institute list | 2026-09-26 |
| Uptime Institute | YYZ2-A Phase I (Formerly TR3), Phase I | Uptime Institute list | 2026-09-26 |
| Uptime Institute | YYZ2-A Phase I (Formerly TR3), Phase I & II | Uptime Institute list | 2026-09-26 |
Source data retrieved 2026-09-26. How the data is compiled