Data Centers Intel

Perth 2 Data Centre, Stage 2A

EnterpriseBuilding

Perth 2 Data Centre, Stage 2A carries a Tier III certification from Uptime Institute, specifically a Certification of Constructed Facility, and appears in the directory as reported by that source under the same name. Metronode Pty Limited operates the facility, which is the only listing the company holds in Shenton Park Perth; across Australia the operator has four listings in total, spread across three other cities besides Perth, including Canberra and Melbourne, each with one listing. Among the operator's nearest sites are Perth 2 Data Centre, Stage 1, MELB-2 Data Center, and Canberra 1 Data Centre, Stage 1. The record is logged at building level, with location accuracy given as approximate, centred on the city. No status is recorded for the facility in this entry. Australia has 39 facilities in the directory carrying Uptime Institute certification, placing this building among that certified group within the country.

Written by a language model (Claude) from this record's data, and checked automatically against it: every figure, name, status and rank in it comes from the record.

Operator
Metronode Pty Limited
City
Shenton Park Perth
Country
Australia
Coordinates
-31.95952, 115.81393
Location accuracy
Approximate (city center)
Facility type
Enterprise
Record level
Building
Uptime Institute certification
Tier III (Certification of Constructed Facility)

Approximate location.

Other Metronode Pty Limited facilities

Metronode Pty Limited: all 4 listed facilities

Sources for this record

Sources for this record
SourceListed asLinkRetrieved
Uptime InstitutePerth 2 Data Centre, Stage 2AUptime Institute list2026-09-26

Source data retrieved 2026-09-26. How the data is compiled

Report an error in this listing