Data Centers Intel

N+ONE DATACENTER II, Phase 1

EnterpriseBuilding

N+ONE DATACENTER II, Phase 1 in Settat carries an Uptime Institute Tier III designation, covering both Certification of Constructed Facility and Certification of Design Documents. The facility appears as a Building-level record, with location given only at city-centre accuracy. Uptime Institute records 23 certified facilities in Morocco, placing this site among that group. NPONE SARL operates two listed facilities in total, one of them in Settat and the other in Nouaceur; the Settat listing accounts for the operator's only presence in that city. The operator's nearest other listed site is N+ONE DATACENTER I, Phase 2. No status has been recorded for this facility, so its current operating condition is not stated. The only public source listing this facility is Uptime Institute, where it is recorded under the same name, N+ONE DATACENTER II, Phase 1. No IT load, utility power, floor area, or campus size figures are given in the record.

Written by a language model (Claude) from this record's data, and checked automatically against it: every figure, name, status and rank in it comes from the record.

Operator
NPONE SARL
City
Settat
Country
Morocco
Coordinates
33.00240, -7.61987
Location accuracy
Approximate (city center)
Facility type
Enterprise
Record level
Building
Uptime Institute certification
Tier III (Certification of Constructed Facility; Certification of Design Documents)

Approximate location.

Other NPONE SARL facilities

NPONE SARL: all 2 listed facilities

Sources for this record

Sources for this record
SourceListed asLinkRetrieved
Uptime InstituteN+ONE DATACENTER II, Phase 1Uptime Institute list2026-09-26

Source data retrieved 2026-09-26. How the data is compiled

Report an error in this listing