Data Centers Intel

Chindata Cunrui Data Center, 3rd Phase Project, Building 5

ColocationBuilding

Chindata ranks first among seven operators listed in Zhangjiakou, with eight listings in the city and no other operator tied at that count. Chindata Cunrui Data Center, 3rd Phase Project, Building 5 is recorded by Uptime Institute under four related listings: as itself, as part of "Buildings 5–7" in the same 3rd Phase Project, and under the 4th Phase Project as "Building 8" and as "Buildings 8–10." The facility holds Uptime Institute Tier III certification, covering both the Certification of Design Documents and the M&O Stamp of Approval, part of a total of 88 Uptime-certified facilities recorded in China. Chindata operates 15 listed facilities in China overall, two of them in Zhangjiakou, with other cities in the country including Datong, Huailai, and Shanghai, each with one listing. The operator's nearest other sites include Lingqiu Data Center, Building-3, and the Sangyuan Cloud Computing Industrial Base, Phase 3, Building 314 Data Center. No status is recorded for this facility.

Written by a language model (Claude) from this record's data, and checked automatically against it: every figure, name, status and rank in it comes from the record.

Operator
Chindata
City
Zhangjiakou
Country
China
Coordinates
39.39058, 112.51660
Location accuracy
Approximate (city center)
Facility type
Colocation
Record level
Building
Uptime Institute certification
Tier III (Certification of Design Documents; M&O Stamp of Approval)

Approximate location.

Other Chindata facilities

Chindata: all 15 listed facilities

Sources for this record

Sources for this record
SourceListed asLinkRetrieved
Uptime InstituteChindata Cunrui Data Center, 3rd Phase Project, Building 5Uptime Institute list2026-09-26
Uptime InstituteChindata Cunrui Data Center, 3rd Phase Project, Buildings 5–7Uptime Institute list2026-09-26
Uptime InstituteChindata Cunrui Data Center, 4th Phase Project, Building 8Uptime Institute list2026-09-26
Uptime InstituteChindata Cunrui Data Center, 4th Phase Project, Buildings 8–10Uptime Institute list2026-09-26

Source data retrieved 2026-09-26. How the data is compiled

Report an error in this listing