Centre Varennes
Centre Varennes appears in the Uptime Institute listing under that same name, and it holds Uptime Institute certification as Tier III (Certification of Constructed Facility; Certification of Design Documents). The facility is operated by Hydro-Québec, which has two listings in Canada in total, one of them being this one in Sainte-Julie, and the other located in Drummondville. Within the Montreal market, Hydro-Québec ranks fifth among 15 operators by number of listings, tied with ten other operators, out of 40 total listings recorded in that market. The operator's nearest other listed site is Centre de données d'Hydro-Québec. Centre Varennes is classified at the building record level, with its location accuracy noted as approximate, based on city center coordinates. No status has been recorded for the facility. Among the facilities with Uptime certification listed in Canada, there are 31 such certifications recorded in the country.
Written by a language model (Claude) from this record's data, and checked automatically against it: every figure, name, status and rank in it comes from the record.
- Operator
- Hydro-Québec
- City
- Sainte-Julie
- Market
- Montreal
- Country
- Canada
- Coordinates
- 45.59306, -73.33959
- Location accuracy
- Approximate (city center)
- Facility type
- Enterprise
- Record level
- Building
- Uptime Institute certification
- Tier III (Certification of Constructed Facility; Certification of Design Documents)
Approximate location.
Other Hydro-Québec facilities
- Centre de données d'Hydro-QuébecDrummondville, Canada
Hydro-Québec: all 2 listed facilities
Sources for this record
| Source | Listed as | Link | Retrieved |
|---|---|---|---|
| Uptime Institute | Centre Varennes | Uptime Institute list | 2026-09-26 |
Source data retrieved 2026-09-26. How the data is compiled