Data centers in Honduras
5 data centers are listed in Honduras. The cities with the most listings are Tegucigalpa (4) and San Pedro Sula (1). Banco Central de Honduras (BCH) accounts for 2 listings, 40% of the total; the next largest are Telefónica Celular S.A. (2) and BAC-Credomatic (1).
All of them are listed as enterprise facilities. Across all listed countries the enterprise share is 16%.
Worldwide, Honduras ranks 91st of 152 countries by number of listings, with under 1% of all listed facilities. In Central America it ranks 5th of 7; the others with the most listings are Mexico (89), Costa Rica (32) and Guatemala (9).
5 facilities hold an Uptime Institute Tier certification (5 Tier III). Tier III: CPP Honduras, Centro de Computo Primario, Centro de Cómputo Alterno, TIGO Honduras, Phase 1 and 1 other.
4 of 5 facilities have coordinates.
Facilities
| Facility | Operator | City | Status | Published MW | Type |
|---|---|---|---|---|---|
| Centro de Cómputo Alterno | Banco Central de Honduras (BCH) | San Pedro Sula | Enterprise | ||
| Centro de Computo Primario | Banco Central de Honduras (BCH) | Tegucigalpa | Enterprise | ||
| CPP Honduras | BAC-Credomatic | Tegucigalpa | Enterprise | ||
| Honduras Tigo Data Center Evolution, Phases 2A and 2B | Telefónica Celular S.A. | Tegucigalpa | Enterprise | ||
| TIGO Honduras, Phase 1 | Telefónica Celular S.A. | Tegucigalpa | Enterprise |
Operators
| Operator | Facilities |
|---|---|
| Banco Central de Honduras (BCH) | 2 |
| Telefónica Celular S.A. | 2 |
| BAC-Credomatic | 1 |
Uptime Institute certified data centers in Honduras
| Facility | Operator | Certification |
|---|---|---|
| Centro de Cómputo Alterno | Banco Central de Honduras (BCH) | Tier III (Certification of Design Documents) |
| Centro de Computo Primario | Banco Central de Honduras (BCH) | Tier III (Certification of Constructed Facility; Certification of Design Documents) |
| CPP Honduras | BAC-Credomatic | Tier III (Certification of Constructed Facility; Certification of Design Documents) |
| Honduras Tigo Data Center Evolution, Phases 2A and 2B | Telefónica Celular S.A. | Tier III (Certification of Design Documents) |
| TIGO Honduras, Phase 1 | Telefónica Celular S.A. | Tier III (Certification of Design Documents) |